Fault Isolation Procedures

Power-Up Sequence Test, continued

Step H

Procedure

Condition

Action

 

 

 

 

1.Key off.

2.Measure resistance between:

• Central Processing Unit 32-way connector pin C4 and Antenna

4-way connector pin 3.

Central Processing Unit 32-way connector and pin C4 and ground.

If resistance between pin C4 and pin 3 is 0 to .3 ohms and if resistance between pin C4 and ground is more than 10K ohms or open circuit [OL]

If any of the above conditions are not met

Go to Step I.

Repair OEM wiring harness between Antenna and Central Processing Unit. Go to Step V.

D C

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 16

1

4

2

3

 

OHMS

 

V

COM

A

DC

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 16

 

OHMS

 

V

COM

A

GROUND

Power-Up Sequence Test

2-12

Page 23
Image 23
BENDIX BW2849 manual Step H