SRP-270

8-8-2-5 Main assembling - #2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name of Parts

 

 

 

 

 

Method and Procedure

GEAR REDUCTION A

1. Set FRAME MAIN on the JIG.

GEAR REDUCTION B

2. Set GEAR REDUCTION A, GEAR REDUCTION B,

RIBBON FEEDER ASSY

RIBBON FEEDER ASSY and GEAR REDUCTION "C"

GEAR REDUCTION “C”

onto SHAFT sequentially. Grease teeth and upper face of

LEVER RIBBON FEED ASSY

RIBBON FEED ASSY.

WASHER (ø 2.6*5*0.5, 2EA)

3. Insert LEVER RIBBON FEED ASSY and WASHER.

MAIN PCB ASSY

4. Attach FPC CONNECTOR to MAIN PCB ASSY. Next,

FPC CONNECTOR

plug SOLENOID WIRE (block) in connecter 2p. And then, set

SCREW MACHINE (M3*4)

it to M/F and tighten two SCREW MACHINE.

CARRIAGE HEAD ASSY

5. Insert BELT SYNCHRONUOS into CARRIAGE HEAD

BELT SYNCHRONUOS

ASSY, and then, belt up round PULLEY and GEAR PULLEY.

SPRING LEVER TENSION BELT

6. Hoot SPRING LEVER TENSION BELT.

 

 

 

<Check Point>

 

 

 

Check the tear of FPC.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rev. 3.02

- 82 -

Page 82
Image 82
BIXOLON SRP-270 ①GEAR Reduction a, ②GEAR Reduction B, ③RIBBON Feeder Assy, ④GEAR Reduction C, ⑤LEVER Ribbon Feed Assy