Body Solid G2B manual Two 85 5/16 x 5/16 allen screw

Models: G2B

1 86
Download 86 pages 23.09 Kb
Page 26
Image 26

S T E P

9

Be careful to assemble all components in the sequence they are presented.

A.Attach Back Pad (BB) to Back Pad Frame (U) using:

Two 59 (5/16” x 1 3/4” hex head bolt)* Two 72 (5/16” spring lock washer)

Two 73 (5/16” washer)

*Do NOT over-tighten pad bolts (59). Tighten these bolts until spring lock washer is flat. Over - tightening these bolts will cause T - nuts in pads to strip out.

B.Attach Foot Brace (M) to the front of Main Base Frame (A) using Shaft (84) and the pre-installed hardware:

Two 85 (5/16” x 5/16” allen screw)

C.Insert two Pulleys (34) into the Press Arm Support (X) as shown using:

Two 57 (3/8” x 7 1/4” hex head bolt) Four 1 (spacer sleeve)

Four 70 (3/8” washer)

Two 67 (3/8” nylon lock nut)

D.Attach one Pulley (34) onto the flanges near the rear of Main Base Frame (A) as shown using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)

One 67 (3/8” nylon lock nut)

E.Attach one Pulley (34) and Leg Extension Hook (104) onto the flanges near the front on Main Base Frame (A) as shown using:

One 54 (3/8” x 2 3/4” hex head bolt) Three 70 (3/8” washer)

One 103 (1/4” spacer) One 105 (1/2” spacer)

One 67 (3/8” nylon lock nut)

F.Attach two 3” Pulley (36) onto Multi Hip Vertical Frame (P) using:

Two 64 (3/8” x 2” hex head bolt) Two 70 (3/8” washer)

Two 67 (3/8” nylon lock nut)

NOTE:

Leave all hardware finger tight. Do not wrench tighten hardware until after the final cable adjustments are complete in Step 15.

mm

Inch

26

Page 26
Image 26
Body Solid G2B manual Two 85 5/16 x 5/16 allen screw