S T E P

16

Be careful to assemble all components in the sequence they are presented.

SEE NOTE 1 ON PAGE 41:

A.Apply weight stack numbers to weight stack Top Plate (29) and each Weight Stack Plate (87) as shown.

SEE NOTE 2 ON PAGE 41:

B.Front Shroud (DA) is pre-assembled with Shroud Insert (DB). Attach Front Shroud (DA) to the side of the weight stack as shown.

Bolt onto Main Base Frame (A) at the bottom and Top Weight Stack Frame (R) using:

Two 108 (3/8” x 5/8” round allen head) Two 70 (3/8” washer)

C.Attach Back Shroud (DC), to the back side of the weight stack, onto the Main Base Frame (A) at the bottom and to the Top Weight Stack Frame (R) as shown using:

Two 108 (3/8” x 5/8” round allen head) Two 70 (3/8” washer)

D.Attach Press Arm Shroud (DD) to the Press Arm Support (X) using:

Four 109 (1/8” x 3/8” screw)

E.Connect the Water Bottle Bracket (44) to the Weight Stack Shroud (DA) using:

Two 137 (1/8” washer) Two 109 (1/8” x 3/8” screw)

F.Slide the Water Bottle Holder (43) onto the Water Bottle Bracket (44) as shown.

mm

Inch

40

Page 40
Image 40
Body Solid G2B manual Two 108 3/8 x 5/8 round allen head Two 70 3/8 washer, Four 109 1/8 x 3/8 screw