Body Solid G2B manual E P

Models: G2B

1 86
Download 86 pages 23.09 Kb
Page 30
Image 30

S T E P

11

Be careful to assemble all components in the sequence they are presented.

High Pulley Cable (37)

Ball Stop End

Metal Ball End

3916 mm

12’ 10”

 

 

Note:

All Pulleys in this step are 4 1/4” diameter.

Leave all pulley bolts hand tight until step 15 is completed.

A.See Diagram 1. Route High Pulley Cable (37) through the top of Double Pulley Holder (CA) and install Pulley (A7) into the top of Double Pulley Holder (CA) as shown in Diagram 2 using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)

One 67 (3/8” nylon lock nut)

Attach Rubber Pad (14) to the top of Double Pulley Holder (CA) as shown.

B.See Diagram 1. Route Cable (37) up and into the pulley holder on the Top Weight Stack Frame (R). Installed Pulley (A8) under Cable (37) as shown in Diagram 2 using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)

One 67 (3/8” nylon lock nut)

Route Cable (37) down towards the weight stack.

C.See Diagram 1A. First remove Allen Head Bolt (65). The Metal Ball End of Cable (37) should be hanging just above the Weight Stack. slide Metal Ball End of Cable (37) through the Selector Rod Top Bolt (98). Attach Cable End Shaft (99) and securely tighten Allen Screw (100). Pull Cable (37) tight, so Cable End Shaft (99) fits securely inside Selector Rod Top Bolt (98). Install Allen Head

Bolt (65) in Selector Rod Top Bolt (98) and hold in place with Nylon Lock Nut (67).

Note:

Make sure the Selector Rod Top Bolt (98) is threaded inside Selector Rod (33) at least one half inch. Make sure Spring Lock Washer (101) is in place and wrench tighten Jam Nut (102).

NOTE:

Leave all hardware finger tight. Do not wrench tighten hardware until after the final cable adjustments are complete in Step 15.

mm

Inch

30

Page 30
Image 30
Body Solid G2B manual E P