Body Solid G2B manual Multi Hip Cable

Models: G2B

1 86
Download 86 pages 23.09 Kb
Page 36
Image 36

S T E P

14

Be careful to assemble all components in the sequence they are presented.

Multi Hip Cable (40)

Stamped Eye End

Chain End

1790 mm

5’ 10”

 

 

A.See Diagram 1A. Attach Multi Hip Cable (40) to the Multi Hip Adjuster (AC) as shown using:

One 58 (5/16” x 1 1/2” hex head bolt) One 63 (7/16”L spacer sleeve)

Two 2 (1/4”L spacer sleeve) One 68 (5/16” nylon lock nut)

B.Remove one of the pre-installed 3” Pulleys (36), either Pulley (C1) or Pulley (C2). Route Cable (40) between the two 3” Pulleys (36), and reinstall 3” Pulley (36).

C.See Diagram 1. Route Cable (40) down along the Multi Hip Vertical Frame (P), and through the opening in the Multi Hip Vertical Frame (P).

Install Pulley (C3) into the opening in Multi Hip Vertical Frame (P) over Cable (40) as shown in Diagram 2 using:

One 53 (3/8” x 2 1/2” hex head bolt) Two 5 (pulley spacer)

One 67 (3/8” nylon lock nut)

D.See Diagram 1. Route Cable (40) around Pulley (C4) and install Pulley (C4) to the pulley flanges on Multi Hip Base (N) as shown in Diagram 2 using:

One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)

One 67 (3/8” nylon lock nut)

E.See Diagram 1. Route Cable (40) up to Pulley Holder (CB) and attach to the open hook on the bottom of Pulley Holder (CB).

NOTE:

Leave all hardware finger tight. Do not wrench tighten hardware until after the final cable adjustments are complete in Step 15.

mm

Inch

36

Page 36
Image 36
Body Solid G2B manual Multi Hip Cable