S T E P

10

Be careful to assemble all components in the sequence they are presented.

High Pulley Cable (37)

Ball Stop End

Metal Ball End

3916 mm

12’ 10”

Note:

All Pulleys in this step are 4 1/4” diameter, except where noted in step 10B*. Leave all pulley bolts hand tight until step 15 is completed.

A.See Diagram 1. Begin at the high pulley station. Route the High Pulley Cable (37) up through the first opening where pulley (A1) will be installed, and out through the top. Route Cable (37) through the opening under the Bi-Angular Bars (Z) and then down through the second opening where pulley (A2) will be installed. Pull the entire length of cable through.

B.See Diagram 2. Insert one Pulley (A1)*, into the first opening in Top Main Frame (E) under Cable (37) and attach using:

One 53 (3/8” x 2 1/2” hex head bolt) Two 5 (pulley spacer)

One 67 (3/8” nylon lock nut)

*For Pulley (A1) use 3 1/2” diameter Pulley (KEY #35 on page 77).

C.See Diagram 2. Insert one Pulley (A2), into the second opening in Top Main Frame (E) under Cable (37) and attach using:

One 53 (3/8” x 2 1/2” hex head bolt) Two 5 (pulley spacer)

One 67 (3/8” nylon lock nut)

D.See Diagram 1. Route Cable (37) over and around pre-installed Pulley (A3).

Route Cable (37) around Pulley (A4) and install Pulley (A4) onto the Angled Vertical Frame (D) as shown in Diagram 2:

One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)

One 67 (3/8” nylon lock nut)

E.See Diagram 1. Route Cable (37) over and around pre-installed Pulley (A5).

Route Cable (37) around Pulley (A6) and install Pulley (A6) into the Angled Vertical Frame (D) as shown in Diagram 2:

One 53 (3/8” x 2 1/2” hex head bolt) Two 5 (pulley spacer)

One 60 (3/8” nylon lock nut)

NOTE:

Leave all hardware finger tight. Do not wrench tighten hardware until after the final cable adjustments are complete in Step 15.

mm

Inch

28

Page 28
Image 28
Body Solid G2B manual High Pulley Cable