4.6Completing the Installation

D9412GV3/D7412GV3 Operation and Installation Guide

4.0

Installation

 

 

 

4.6Completing the Installation

If not already complete, make the earth ground connection to Terminal 10 and lock the reset pin in the closed position.

4.6.1Charging the Battery

Connect the battery, then the transformer to allow the control panel to charge the battery while you complete the installation. Refer to Section 5.0 Power Supply on page 22 for instructions.

On-board Buzzer Sounds at Power Up and Reset: The system performs a series of self-diagnostic tests of hardware, software, and programming at power up and at reset. The buzzer on the control panel sounds during the tests. The self-diagnostics tests complete in approximately 1 to 3 sec.

If the control panel fails any test, the buzzer continues sounding and a System Trouble message appears at the keypads.

Touch Terminal 10 First: If the on-board buzzer sounds briefly when the control panel is touched, any static charge you carry discharges to the control panel.

Avoid electrostatic discharge. Always touch Terminal 10, the earth ground connection, before beginning work on the control panel.

If the control panel receives an electrostatic discharge, it might generate Watchdog Reset and Param Fail events.

4.6.2Installing and Wiring Detection Devices

Install and wire detection devices and keypads at their locations throughout the premises. Do not connect the control panel yet.

Section 8.0 On-Board Points on page 31 contains instructions for wiring the on-board points to detection devices. Section 11.0 Arming Devices on page 55 contains instructions for wiring the keypads.

Instructions for wiring the off-board point POPIT sensor loops are found in the instructions packaged with the POPIT modules.

4.6.3Installing Modules and Relays

1.Power down the unit by unplugging the transformer and disconnecting the battery.

Always power down the unit when installing modules or relays, or when making wiring connections to the control panel.

2.Install and wire any modules required for the installation as described in the module’s installation instructions.

Instructions for the D8125 POPEX Module, D8128D OctoPOPIT Module, D8129 OctoRelay Module, D811 Arm Status Relay Module, and D928 Dual Phone Line Switcher appear in this guide.

Refer to Section 9.0 Off-Board Points on page 36 for D8125 and D8128D instructions. Refer to Section 10.0 Off-Board Relays on page 50 for D8129 and D811 instructions. Refer to Section

7.11 D928 Dual Phone Line Switcher on page 30 for D928 instructions.

3.If using the power outputs at Terminals 7 or 8, refer to Section 6.4 Programmable Power Output Terminals 6, 7, and 8 on page 27 for instructions.

4.6.4Connecting the On-board Points and Keypads

4.Connect the on-board points and keypad wiring to the system. Refer to Section 8.0 On-Board Points on page 31 and Section 11.0 Arming Devices on page 55 for instructions.

4.6.5Powering Up

Reconnect the battery, then plug in the transformer. The buzzer sounds for two sec when the control panel is powered up. Leave the reset pin in the locked position.

Yellow Charging Status LED Remains Lit: If the yellow charging status LED remains lit after five minutes of powering up the control panel, either the battery is deeply discharged or too many powered devices were connected to the control panel. Combined continuous current draw for Terminals 3, 8, 24, and 32, and the accessory connector cannot exceed 1.4 A. Refer to Section 6.0 Power Outputs on page 26 for help.

4.7Programming the Control Panel

If the control panel is not already programmed, review the D9412GV3/D7412GV3 Program Entry Guide (P/N: F01U170807). Ensure that all accessory modules for desired features are available for installation.

Use RPS to load a custom program into the control panel as needed.