Bosch Appliances D9412GV3, D7412GV3 manual Contents

Models: D9412GV3 D7412GV3

1 76
Download 76 pages 25.33 Kb
Page 4
Image 4
Contents

D9412GV3/D7412GV3 Operation and Installation Guide Contents

Contents

 

1.0

Introduction

7

2.0

Lightning Strikes

8

2.1

Effects

8

2.2

Precautions during Installation

8

3.0

Overview

9

3.1

Configuration and Parts

9

3.1.1

Parts List

10

3.1.2

Parts Available by Separate Order

10

3.2

Accessories

11

3.3Features in the D9412GV3 and D7412GV3 12

3.3.1

SDI Molex Connector

12

3.3.2

Tip and Ring Posts

12

3.3.3

Telephone Line Sniff

12

3.3.4

Points

12

3.3.5

Areas and Accounts

12

3.3.6

Digital Communicator

12

3.3.7

Keypads

13

3.3.8

Keyswitch

13

3.3.9

Access Control

13

3.3.10

Event Memory

13

3.3.11

Event Log

13

3.3.12

Ground Fault Detection

13

3.3.13

Ground Fault Detection Added Feature

14

3.3.14

Conettix Functions

14

3.3.15

Programming

14

3.3.16

Other Features

14

4.0

Installation

14

4.1

Installation Preparation

14

4.2

Enclosure Options

14

4.3

Mounting Enclosure

14

4.4

Installing the Control Panel

15

4.5

Connecting Earth Ground

15

4.5.1

Terminal 10

15

4.5.2

Ground Fault Detect Enable

15

4.5.3

Enabling Ground Fault Detection

16

4.5.4

Ground Fault Specifications

16

4.5.5

Locking the Reset Pin

16

4.6

Completing the Installation

17

4.6.1

Charging the Battery

17

4.6.2

Installing and Wiring Detection Devices

17

4.6.3

Installing Modules and Relays

17

4.6.4Connecting the On-board Points and

Keypads

17

4.6.5 Powering Up

17

4.7

Programming the Control Panel

17

4.8

Installing the Point Chart Label

18

4.9

Testing the System

18

4.10

Service Walk Test

18

5.0

Power Supply

22

5.1

Primary Power Terminals 1 and 2

22

5.1.1

Primary (AC) Power Circuit

22

5.1.2

Installing the Transformer

22

5.2

Secondary Power Terminals

22

5.2.1

Secondary (DC) Power

22

5.2.2

Installing the Battery

22

5.2.3

Replacing the Battery

24

5.2.4

Battery Supervision

24

5.2.5

Battery Charging Circuit

24

5.2.6Battery Discharge and Recharge Schedule 25

6.0

Power Outputs

26

6.1

Circuit Protection

26

6.2

Total Available Power

26

6.3Continuous Power Output Terminals 3, 8, 24,

and 32

26

6.4Programmable Power Output Terminals 6, 7,

 

and 8

27

6.4.1

Programming

27

6.4.2

Terminals 6 and 7

27

6.4.3

Fire System Power Formula

27

6.4.4

Terminal 8

27

7.0

Telephone Connections

28

7.1

Registration

28

7.2

Notification

28

7.3

Location

28

7.4

Telephone Cord Connection

28

7.5

Phone LED (Red)

29

7.6

Operation Monitor LED (Green)

29

7.7

Dialing Format

29

7.8

Telephone Line Monitor

29

7.9

Called Party Disconnect

29

7.10

Communication Failure

29

7.11

D928 Dual Phone Line Switcher

30

7.11.1

Description

30

7.11.2

Operation

30

7.11.3

Installing the D928

31

7.11.4

D928 Status LEDs

31

8.0

On-Board Points

31

8.1

Terminals 11 to 22 Description

31

8.2

Point Sensor Loops

31

8.3

Point Parameters

32

8.4

Point Response Time

33

Bosch Security Systems, Inc. 10/10 F01U143070-03

4

Page 4
Image 4
Bosch Appliances D9412GV3, D7412GV3 manual Contents