COPPER BRUTE II (500 - 2000)

Page 19

 

 

 

 

SYSTEM

RETURN

C

B

A

PUMP LOCATION FOR

NON-PUMP-MOUNTED UNITS

T1

COLD WATER

MAKE-UP

 

SYSTEM

SYSTEM PUMP

SUPPLY

 

ADJUSTMENT PROCEDURE TO MAINTAIN

B

120°F INLET TEMP:

 

A1. Turn on boiler and open valves A & B.

2.After steady-state operation, if T1 is less than 120°F, slowly close valve B until T1 climbs to 120°F.

3.If T1 is greater than 120°F, slowly close valve A until T1 drops to 120°F.

4.Check after system operating temperature has stabilized. Make final adjustments.

T1

CAUTION: THIS DRAWING SHOWS SUGGESTED

 

 

PIPING CONFIGURATION AND VALVING, CHECK

PUMP LOCATION FOR PUMP-MOUNTED UNITS

WITH LOCAL CODES AND ORDINANCES FOR

 

 

ADDITIONAL REQUIREMENTS.

 

 

PRIMARY/SECONDARY MANDITORY FOR ALL

 

 

 

 

 

 

 

 

VARIABLE FLOW SYSTEMS

LEGEND

 

 

INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM

 

 

PIPING & SIZING OF EXPANSION TANK

 

 

 

 

THERMOMETER

 

EXPANSION TANK

PER TANK MANUFACTURER'S INSTRUCTIONS

 

 

 

WITH AIR SCOOP AND

DIMENSION "C" (COMMON PIPING) TO BE FOUR

 

 

 

 

AUTO AIR VENT

PIPE DIAMETERS, MAX. (NO ELBOWS OR VALVES)

 

PURGE

 

 

TEMPERATURE

 

 

 

VALVE

 

 

BOILER CIRCUIT PIPING MUST BE EQUAL

SENSOR

 

 

 

 

 

 

TO BOILER WATER CONNECTION SIZE

GLOBE VALVE

 

3-WAY VALVE

BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER

 

 

 

 

 

 

 

CHECK VALVE

 

VALVE

 

DOTTED DEVICES INDICATE ALTERNATE LOCATIONS

 

 

 

 

 

 

 

 

 

 

 

PUT BOILER CONTROL SENSOR IN THE SYSTEM

PRESSURE REDUCING VALVE

 

 

SUPPLY WHEN USING THIS PIPING STYLE.

 

 

 

W/ FAST FILL BYPASS

PUMP

 

MINIMUM BOILER INLET WATER TEMPERATURE

 

 

 

 

MUST BE AT LEAST 120°F.

Figure 8. Hydronic Piping - Primary-Secondary, Reverse-Return, Low Temperature.

Page 19
Image 19
Bradford-White Corp BWCH, BWCV, Copper Brute II Hydronic Boiler warranty Boiler CIRC. Pump Sized for Flow Through Boiler