Manuals
/
Bradford-White Corp
/
Household Appliance
/
Water Heater
Bradford-White Corp
BWCV, BWCH
warranty
Copper Brute II 500 1000 Wiring Schematic
Models:
BWCH
Copper Brute II Hydronic Boiler
BWCV
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
64
Download
64 pages
39.09 Kb
25
26
27
28
29
30
31
32
33
34
Troubleshooting
Parts list
Field Wiring Panel
Warranty
Dimension
Maintenance
Outdoor Reset Operation
Temperature Control
Flow Switch
Choosing the Mode
Page 30
Image 30
Page 30
B
RADFORD
W
HITE
C
ORP.
Figure 19. Copper Brute II 500 - 1000 Wiring Schematic.
Page 29
Page 31
Page 30
Image 30
Page 29
Page 31
Contents
Copper Brute
Table of Contents
Replacement Parts
Maintenance
Trouble Shooting
Operating Instructions
General Information
Introduction
Model Identification
Warranty
Dimensions
Locating the Appliance
Dimensional Data
Inches 91cm horizontally
Combustion Air From Room
Venting and Combustion Air
Combustion Air
Intake Combustion Air
Category I Vent
Venting
Vent Categories
Common Venting Systems
Combustion Air and Vent Through Side Wall
Side Wall Vent Terminal
Locating Vent & Combustion Air Terminals
Category III Vent
Side Wall Combustion Air Terminal
Vertical Vent Terminal
Common Vent Test Boilers
Vent Terminals for Outdoor Units
Vertical Combustion Air Terminal
Gas Supply and Piping
61-91m
4A.2 Cold Water Make-Up Boiler
Water Connections Copper Brute II Boiler
4A.1 Heating System Piping Hot Supply Connections Boiler
4A.3 Water Flow Requirements Boiler
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping Multiple Boilers, Low Temperature System
Hydronic Piping One Boiler, Multi-Temperature System
Hydronic Piping Primary-Secondary, Reverse-Return
Boiler CIRC. Pump Sized for Flow Through Boiler
4B.2 Hot Water Supply Piping Water Heater
Water Connections Copper Brute II Water Heater
4B.1 Water System Piping Water Heater
4B.3 Water Flow Requirements Water Heater
4B.5 Freeze Protection Water Heater
Supply
Water Heater Piping Multiple Heaters, One Tank
Water Heater Piping Multiple Heaters, Multiple Tanks
Main Power
Temperature Control
Electrical Connections
Field Wiring Panel
External Staging Control Wiring
Avertissement
Copper Brute II 500 750 Ladder Diagram
Copper Brute II 1000 Ladder Diagram
Copper Brute II 1250 2000 Ladder Diagram
Copper Brute II 500 1000 Wiring Schematic
Copper Brute II 1250 1500 Wiring Schematic
Copper Brute II 1750 2000 Wiring Schematic
Terminal designations are as indicated
Field Wiring for Modes 1
Avertissement
Operating Instructions
Sequence of Operation
Filling the Boiler System
System Piping Primary Secondary Piping
Programming the Temperature Control
Choosing the Mode
Parallel Piping
For ALL Other Modes
Hydronic Primary/Secondary Mode
Choosing the Mode for your Application
Mechanical aquastat in a domestic hot water storage tank
Mode 5 Primary secondary piping with outdoor reset
Staging Mode
Advanced Topics
Differential
Boiler Maximum Boil MAX
Boiler Target Temperature
Boiler Minimum Boil MIN
Pump Operation
Outdoor Reset Operation
Setpoint Operation
Dedicated Domestic Hot Water
Typical Gas Train Configuration
Set Up for 0 to 2500 Feet Altitude
Operating the Burner and Set Up
Advanced Programming Mode
External Boiler Operation
High Altitude Adjustment and Set Up
Shutting Down the Copper Brute
To Restart the Copper Brute
Maintenance
System Maintenance
Appliance Maintenance Component Description
Ignition Controls
Temperature Control
Flow Switch
Ignitors
Bradford White Corp
Trouble Shooting
Troubleshooting the Temperature Control
Troubleshooting Copper Brute Controls
Copper Brute II 500 Troubleshooting Error Codes
Replacement Parts
Parts List
See Figures 35
Heat Exchanger Components
Electrical Components
Gas Train Components
Burner Manifold Assy, 4 Burners, Left, LP
For reference
Internal Components
Copper Brute II Hydronic
Electrical Components
H2214401F
Top
Page
Image
Contents