Manuals
/
Bradford-White Corp
/
Household Appliance
/
Water Heater
Bradford-White Corp
BWCH, BWCV
warranty
Copper Brute II 1000 Ladder Diagram
Models:
BWCH
Copper Brute II Hydronic Boiler
BWCV
1
28
64
64
Download
64 pages
39.09 Kb
25
26
27
28
29
30
31
32
<
>
Troubleshooting
Parts list
Field Wiring Panel
Warranty
Dimension
Maintenance
Outdoor Reset Operation
Temperature Control
Flow Switch
Choosing the Mode
Page 28
Image 28
Page 28
B
RADFORD
W
HITE
C
ORP.
Figure 17. Copper Brute II 1000 Ladder Diagram.
Page 27
Page 29
Page 28
Image 28
Page 27
Page 29
Contents
Copper Brute
Table of Contents
Maintenance
Trouble Shooting
Replacement Parts
Operating Instructions
Introduction
General Information
Model Identification
Dimensions
Warranty
Locating the Appliance
Dimensional Data
Inches 91cm horizontally
Venting and Combustion Air
Combustion Air
Combustion Air From Room
Intake Combustion Air
Venting
Vent Categories
Category I Vent
Common Venting Systems
Combustion Air and Vent Through Side Wall
Locating Vent & Combustion Air Terminals
Category III Vent
Side Wall Vent Terminal
Side Wall Combustion Air Terminal
Common Vent Test Boilers
Vent Terminals for Outdoor Units
Vertical Vent Terminal
Vertical Combustion Air Terminal
Gas Supply and Piping
61-91m
Water Connections Copper Brute II Boiler
4A.1 Heating System Piping Hot Supply Connections Boiler
4A.2 Cold Water Make-Up Boiler
4A.3 Water Flow Requirements Boiler
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping Multiple Boilers, Low Temperature System
Hydronic Piping One Boiler, Multi-Temperature System
Hydronic Piping Primary-Secondary, Reverse-Return
Boiler CIRC. Pump Sized for Flow Through Boiler
Water Connections Copper Brute II Water Heater
4B.1 Water System Piping Water Heater
4B.2 Hot Water Supply Piping Water Heater
4B.3 Water Flow Requirements Water Heater
4B.5 Freeze Protection Water Heater
Supply
Water Heater Piping Multiple Heaters, One Tank
Water Heater Piping Multiple Heaters, Multiple Tanks
Temperature Control
Main Power
Electrical Connections
Field Wiring Panel
External Staging Control Wiring
Avertissement
Copper Brute II 500 750 Ladder Diagram
Copper Brute II 1000 Ladder Diagram
Copper Brute II 1250 2000 Ladder Diagram
Copper Brute II 500 1000 Wiring Schematic
Copper Brute II 1250 1500 Wiring Schematic
Copper Brute II 1750 2000 Wiring Schematic
Terminal designations are as indicated
Field Wiring for Modes 1
Avertissement
Sequence of Operation
Operating Instructions
Filling the Boiler System
Programming the Temperature Control
Choosing the Mode
System Piping Primary Secondary Piping
Parallel Piping
For ALL Other Modes
Hydronic Primary/Secondary Mode
Choosing the Mode for your Application
Mechanical aquastat in a domestic hot water storage tank
Mode 5 Primary secondary piping with outdoor reset
Advanced Topics
Staging Mode
Differential
Boiler Target Temperature
Boiler Minimum Boil MIN
Boiler Maximum Boil MAX
Pump Operation
Setpoint Operation
Outdoor Reset Operation
Dedicated Domestic Hot Water
Typical Gas Train Configuration
Operating the Burner and Set Up
Advanced Programming Mode
Set Up for 0 to 2500 Feet Altitude
External Boiler Operation
Shutting Down the Copper Brute
High Altitude Adjustment and Set Up
To Restart the Copper Brute
System Maintenance
Maintenance
Appliance Maintenance Component Description
Temperature Control
Flow Switch
Ignition Controls
Ignitors
Bradford White Corp
Trouble Shooting
Troubleshooting the Temperature Control
Troubleshooting Copper Brute Controls
Copper Brute II 500 Troubleshooting Error Codes
Replacement Parts
Parts List
See Figures 35
Heat Exchanger Components
Electrical Components
Gas Train Components
Burner Manifold Assy, 4 Burners, Left, LP
For reference
Internal Components
Copper Brute II Hydronic
Electrical Components
H2214401F
Top
Page
Image
Contents