Manuals
/
Bradford-White Corp
/
Household Appliance
/
Water Heater
Bradford-White Corp
Copper Brute II Hydronic Boiler Copper Brute II 1250 2000 Ladder Diagram
Models:
BWCH
Copper Brute II Hydronic Boiler
BWCV
1
29
64
64
Download
64 pages
39.09 Kb
26
27
28
29
30
31
32
33
<
>
Troubleshooting
Parts list
Field Wiring Panel
Warranty
Dimension
Maintenance
Outdoor Reset Operation
Temperature Control
Flow Switch
Choosing the Mode
Page 29
Image 29
COPPER BRUTE II (500 - 2000)
Page 29
Figure 18. Copper Brute II 1250 - 2000 Ladder Diagram.
Page 28
Page 30
Page 29
Image 29
Page 28
Page 30
Contents
Copper Brute
Table of Contents
Trouble Shooting
Maintenance
Replacement Parts
Operating Instructions
Model Identification
General Information
Introduction
Locating the Appliance
Warranty
Dimensions
Dimensional Data
Inches 91cm horizontally
Combustion Air
Venting and Combustion Air
Combustion Air From Room
Intake Combustion Air
Vent Categories
Venting
Category I Vent
Common Venting Systems
Combustion Air and Vent Through Side Wall
Category III Vent
Locating Vent & Combustion Air Terminals
Side Wall Vent Terminal
Side Wall Combustion Air Terminal
Vent Terminals for Outdoor Units
Common Vent Test Boilers
Vertical Vent Terminal
Vertical Combustion Air Terminal
61-91m
Gas Supply and Piping
4A.1 Heating System Piping Hot Supply Connections Boiler
Water Connections Copper Brute II Boiler
4A.2 Cold Water Make-Up Boiler
4A.3 Water Flow Requirements Boiler
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping Multiple Boilers, Low Temperature System
Hydronic Piping One Boiler, Multi-Temperature System
Hydronic Piping Primary-Secondary, Reverse-Return
Boiler CIRC. Pump Sized for Flow Through Boiler
4B.1 Water System Piping Water Heater
Water Connections Copper Brute II Water Heater
4B.2 Hot Water Supply Piping Water Heater
4B.3 Water Flow Requirements Water Heater
Supply
4B.5 Freeze Protection Water Heater
Water Heater Piping Multiple Heaters, One Tank
Water Heater Piping Multiple Heaters, Multiple Tanks
Electrical Connections
Main Power
Temperature Control
Field Wiring Panel
Avertissement
External Staging Control Wiring
Copper Brute II 500 750 Ladder Diagram
Copper Brute II 1000 Ladder Diagram
Copper Brute II 1250 2000 Ladder Diagram
Copper Brute II 500 1000 Wiring Schematic
Copper Brute II 1250 1500 Wiring Schematic
Copper Brute II 1750 2000 Wiring Schematic
Terminal designations are as indicated
Field Wiring for Modes 1
Avertissement
Filling the Boiler System
Operating Instructions
Sequence of Operation
Choosing the Mode
Programming the Temperature Control
System Piping Primary Secondary Piping
Parallel Piping
For ALL Other Modes
Hydronic Primary/Secondary Mode
Mechanical aquastat in a domestic hot water storage tank
Choosing the Mode for your Application
Mode 5 Primary secondary piping with outdoor reset
Differential
Staging Mode
Advanced Topics
Boiler Minimum Boil MIN
Boiler Target Temperature
Boiler Maximum Boil MAX
Pump Operation
Dedicated Domestic Hot Water
Outdoor Reset Operation
Setpoint Operation
Typical Gas Train Configuration
Advanced Programming Mode
Operating the Burner and Set Up
Set Up for 0 to 2500 Feet Altitude
External Boiler Operation
To Restart the Copper Brute
High Altitude Adjustment and Set Up
Shutting Down the Copper Brute
Appliance Maintenance Component Description
Maintenance
System Maintenance
Flow Switch
Temperature Control
Ignition Controls
Ignitors
Bradford White Corp
Trouble Shooting
Troubleshooting Copper Brute Controls
Troubleshooting the Temperature Control
Copper Brute II 500 Troubleshooting Error Codes
Parts List
Replacement Parts
See Figures 35
Heat Exchanger Components
Electrical Components
Gas Train Components
Burner Manifold Assy, 4 Burners, Left, LP
For reference
Internal Components
Copper Brute II Hydronic
Electrical Components
H2214401F
Top
Page
Image
Contents