COPPER BRUTE II (500 - 2000)

Page 33

Note: Positions of field wiring terminals may vary, but

terminal designations are as indicated.

Figure 22. Field Wiring.

Page 33
Image 33
Bradford-White Corp BWCV, BWCH, Copper Brute II Hydronic Boiler warranty Terminal designations are as indicated