Page 18 | BRADFORD WHITE CORP. |
|
|
|
|
COLD WATER
SYSTEM
RETURN
C
SYSTEM PUMP
PUMP LOCATION FOR
PUMP LOCATION FOR
CAUTION: THIS DRAWING SHOWS SUGGESTED | PRIMARY/SECONDARY MANDITORY FOR ALL | |
VARIABLE FLOW SYSTEMS | ||
PIPING CONFIGURATION AND VALVING, CHECK | ||
| ||
WITH LOCAL CODES AND ORDINANCES FOR | INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM | |
ADDITIONAL REQUIREMENTS. | ||
|
PIPING & SIZING OF EXPANSION TANK
PER TANK MANUFACTURER'S INSTRUCTIONS
SYSTEM SUPPLY
LEGEND
THERMOMETER
TEMPERATURE PURGE
SENSOR VALVE GLOBE VALVE
CHECK VALVE
PRESSURE REDUCING VALVE W/ FAST FILL BYPASS
EXPANSION TANK
WITH AIR SCOOP AND AUTO AIR VENT
VALVE
PUMP
DIMENSION "C" (COMMON PIPING) TO BE FOUR PIPE DIAMETERS, MAX. (NO ELBOWS OR VALVES)
BOILER CIRCUIT PIPING MUST BE EQUAL
TO BOILER WATER CONNECTION SIZE
BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER
DOTTED DEVICES INDICATE ALTERNATE LOCATIONS
PUT BOILER CONTROL SENSOR IN THE SYSTEM SUPPLY WHEN USING THIS PIPING STYLE.
MINIMUM BOILER INLET WATER TEMPERATURE MUST BE AT LEAST 120°F.