Cabletron Systems 1000 Ip Routing Network With Ppp Devices, Overview, Initial Installation Steps

Models: 1200 1000

1 106
Download 106 pages 14.3 Kb
Page 58
Image 58
IP ROUTING NETWORK WITH PPP DEVICES

IP ROUTING NETWORK WITH PPP DEVICES

OVERVIEW

This sample network uses IP routing to connect two of our products, both using PPP. Each system is on a separate LAN. The configuration for this network is designed to allow three different types of accesses:

To give Host1 access to resources on LAN2, and to give Host2 access to resources on LAN1.

To give Host2 access to the Internet which is connected to LAN1.

To allow Host1 to remotely manage SITE2, and to allow Host2 to remotely manage SITE1.

These accesses are achieved through configuring a combination of interfaces and static routes.

To better understand the layout of this network, refer to the CyberSWITCH Network Topology Worksheet.

This chapter discusses the configuration process for SITE1 and SITE2. Note that the Network Topology and the System Details worksheets are identical for both systems. Each system has unique Routing Information and Device Information worksheets.

INITIAL INSTALLATION STEPS

The initial steps in the CyberSWITCH installation process are basically the same no matter how complicated the network. These steps are:

completing the requirement worksheets

ordering ISDN service

powering on the system

accessing Release Notes

connecting an administration console

setting up Telnet access

upgrading system software

changing defaults to secure system

returning configuration to factory defaults

The chapters Accessing the CyberSWITCH and Upgrading System Software (in the User’s Guide) describe each of these steps in detail.

Worksheets for this network are included on the next few pages.

Page 58
Image 58
Cabletron Systems 1000, 1200 manual Ip Routing Network With Ppp Devices, Overview, Initial Installation Steps