Canon DU7-1175-000 service manual Installation Steps, General Description

Models: DU7-1175-000

1 44
Download 44 pages 29.83 Kb
Page 28
Image 28

This entire process takes approximately 60 minutes. First time maybe a little longer.

AFTER ASSEMBLY

4.7BACK GAGE AND CHAD CONTROL MECHANISM - ADJUSTMENT, ASSEMBLY / DISASSEMBLY PROCEDURE

The Back Gage with Chad Control Mechanism is available as a kit service.

General Description:

The Professional Puncher-A1 Chad Control Mechanism directs Paper Chad into the Chad Disposal Container, significantly reducing the amount of Chad that could flow through the paper path. There will be some Chad that falls outside the Chad Container. For example, when the customer changes their Die Set, some Chad always comes with the Die and falls to the bottom of the machine or to the floor. As a general practice, it is a good Preventative Maintenance practice to vacuum the inside of the Professional Puncher-A1 periodically.

 

What you need to install this kit:

 

Contents of Kit:

 

 

• Open End Ignition Wrench – ¼”

• Back Gage #7706972

• Nut Driver, 5/16”

E-Prom #7706791, 7706799

Nut Driver ¼”

Brush #7706711

Needle Nose Pliers (Side Cutters)

Holder #7706476

Allen Wrench (for 4-40 SHS – 3/32”)

Wire Cutters

Wire Tie Wraps (Qty. 5)

Screw Driver, Phillips Head

Screw Driver, Flat Head, Small

4.8INSTALLATION STEPS

Step 1: Disconnect power and communication cable.

Step 2: Open door and remove Die Set, chad bin, and rear cover (opposite the door).

28

Page 28
Image 28
Canon DU7-1175-000 service manual Installation Steps, General Description