ε-53

Calling E-Con2 Functions from an eActivity

• To execute sampling from an Econ Sampling strip

1.On the eActivity workspace screen, use the f and c keys to move the highlighting to the Econ Sampling strip.

2.Press w.

This displays a sampling start confirmation screen.

If this is the first time you are using this Econ Sampling strip for sampling, continue on to step 3.

If this is an Econ Sampling strip that you have used for sampling in the paste and want to re-execute with the same setup, jump to step 8.

3.Press !,(,) to display the application list.

4.Use the f and c cursor keys to move the highlighting to “Econ AdvancSetup”, and then press w.

This displays the Advanced Setup screen.

5.Perform steps 4 and 5 under “To configure an EA-200 setup using Advanced Setup (page ε-8) to configure the setup for sampling.

6.Press !,(,) to display the application list.

7.Use the f and c cursor keys to move the highlighting to “Econ Sampling”, and then press w.

This will return to the sampling start confirmation screen in step 2 of this procedure.

8.Press w.

This will set up the EA-200 in accordance with the setup data registered in the Econ Sampling strip. The message “Start sampling?” appears on the screen after EA-200 set up is complete.

9.Press w to start sampling.

The screens that appear while sampling is in progress and after sampling is complete

depend on setup details. For more information, see “Starting a Sampling Operation” (page ε-30).

After sampling is complete, the data will be graphed in accordance with the setup settings.

10.To return to the eActivity workspace screen from the graph screen, press !a(').

20100801