Chapter 3 Installing the GSS

Installing Your GSS

Installing the GSS in a Four-PostRack

This section provides instructions for installing the GSS in a four-post rack. The rack must be properly secured to the floor, ceiling, or upper wall, and where applicable, to adjacent racks. The rack should be secured using floor and wall fasteners and bracing as specified by industry standards.

Before installing the GSS in a rack, be sure you have read Chapter 2, Preparing for Installation, to familiarize yourself with the proper site and environmental conditions. Failure to read and follow these guidelines may lead to an unsuccessful installation and possible damage to the GSS and its components. Perform the steps below when installing and servicing the GSS.

When installing and servicing the GSS:

Disconnect all power and external cables before installing the GSS.

Install the GSS in compliance with your local and national electrical codes:

United States: National Fire Protection Association (NFPA) 70; United States National Electrical Code.

Canada: Canadian Electrical Code, Part, I, CSA C22.1.

Other countries: If local and national electrical codes are not available, see IEC 364, Part 1 through Part 7.

Do not work alone under potentially hazardous conditions.

Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.

Do not attempt to install the GSS in a rack that has not been securely anchored in place. Damage to the GSS and personal injury may result.

Due to the size and weight of the GSS, never attempt to install it by yourself.

Refer to Chapter 2, Preparing for Installation, the “Precautions for Rack-Mounting” section for additional safety information on rack installation.

 

Cisco Global Site Selector 4491 Hardware Installation Guide

3-4

78-16356-01

Page 46
Image 46
Cisco Systems 78-16356-01 manual Installing the GSS in a Four-PostRack