2Prepare for Installation
This section contains information about tools and parts, warnings, site preparation information, and information for
Warning | Only trained and qualified personnel should install, replace, or service this equipment. Statement 1030 |
Before beginning this router installation, read the Regulatory Compliance and Safety Information for the Cisco 1000 Series Aggregation Services Routers document.
Site Preparation and Unpacking
•Lift the router safely out of the packing container.
•Ensure the power service at the site is suitable for the router you are installing.
•Check the packing slip to ensure that all the proper components are present.
•Locate and have accessible the Site Log for recording information about this installation.
Tools and Parts
Use the following list of tools and parts as a checklist for preparing to install the Cisco ASR 1000 Series Aggregation Services Router:
•
•AC power cord
•Appropriate cables to connect the router to the network and to the console terminal
•Tape measure and level
•Screwdrivers: Number 2 Phillips screwdriver and
•Grounding lug and wires
•The
–Four
–Three sets of screws: one set for front
Prepare for Equipment Shelf or Tabletop Installation
For a equipment shelf or tabletop installation, verify the following before installing the router:
•The router is off the floor and has adequate ventilation.
•An adequate chassis ground (earth) connection exists for the router.
•The router has at last 3 inches (7.62 cm) of clearance at the inlet and exhaust vents (sides of router).
•The router has 19 inches (48.3 cm) clearance at the front and rear to allow for
•The shared port adapter filler panels are installed if a shared port adapter is not installed. The slots must not be empty.
3