Front Panel LED Status Indicator Functions

Front Panel LED Status Indicator Functions

Initial Power Up, Calibration, and Registration (AC Power applied)

The following chart illustrates the sequence of steps and the corresponding appearance of the residential gateway front panel LED status indicators during power up, calibration, and registration on the network when AC power is applied to the residential gateway. Use this chart to troubleshoot the power up, calibration, and registration process of your residential gateway.

Note: After the residential gateway completes registration, the modem proceeds immediately to Normal Operations. See Normal Operations (AC Power applied) (on page 107).

Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration

 

 

 

 

High Speed Data Registration

 

 

 

 

 

 

 

 

 

Step:

1

2

3

4

5

6

 

 

 

 

 

 

 

 

Front Panel

Self

Downstream

Downstream

Ranging

Requesting

Request High

Indicator

Test

Scan

Signal Lock

 

IP Address

Speed Data

 

 

 

 

 

 

 

Provisioning

 

 

 

 

 

 

 

File

1

POWER

On

On

On

On

On

On

 

 

 

 

 

 

 

 

2

DS

On

Blinking

On

On

On

On

3

US

On

Off

Off

Blinking

On

On

4

ONLINE

On

Off

Off

Off

Off

Blinking

5

LAN1-

On

On or

On or

On or

On or

On or Blinking

 

LAN4

 

Blinking

Blinking

Blinking

Blinking

 

6

WIRELESS

Off

On or

On or

On or

On or

On or Blinking

 

 

 

Blinking

Blinking

Blinking

Blinking

 

106

4024320 Rev A

Page 106
Image 106
Cisco Systems DPC/EPC2325 DOCSIS Front Panel LED Status Indicator Functions, High Speed Data Registration