1 You need these tools for installation:

wire strain relief

16- or 18-inch adjustable wrench

set of Allen wrenches

½ inch open or box end wrench

flashlight

2 Plan the location. Make sure the area where the saw is installed has the following:

A grounded power source. Check the saw’s serial- al tag for the correct amps, voltage, phase and cycles. All wiring should be completed by qualified personnel and should comply with your region’s electrical codes.

Clearance for safe operation and maintenance. Make sure there is enough clearance around the saw for maintenance and servicing.

PREPARING FOR INSTALLATION

WARNING: Improper installation, oper- ation, or servicing may result in equipment damage or personal injury.

This equipment should only be installed, adjust- ed, and serviced by qualified technical person- nel who are familiar with the construction, oper- ation, and potential hazards of this type of machine.

All wiring, disconnects, and fuses should be installed by qualified electrical technicians in accordance with electrical codes in your region. Always maintain a safe ground. Do not operate the equipment at power levels other than what is specified on the machine serial tag and data plate.

UGE058/0803