1

Make sure all components are installed according

 

to assembly drawings. Make sure that all bolts on the saw

 

have been tightened.

 

 

2

Check that saw is firmly locked into position with

 

the anchoring screws.

 

 

3

Check that all wiring conforms to electrical

 

codes, and all wiring covers are in place.

 

 

4

Plug in the air supply

PREPARING FOR TESTING

1

2

3

Turn on the main disconnect. Plug in the main

power cord and turn on the main disconnect.

Check that the E-Stop button is in the out, extended position.

Press the vacuum start button.

Check the rotation of the vacuum motor for correct phas- ing. (The phase in your plant may be different from the Conair factory.)

TESTING THE INSTALLATION

4

5

Press the saw start button.

Turn off the saw and vacuum.

Check the saw blade rotation.

The top of the saw blade should turn towards the front or operator side. If the top of the blade is spinning away from you or the operator side switch one of the 3-phase plug wires. Then recheck the blade rotation.

6

Make a sample cut. Restart the vacuum and the saw motor and press the manual cut button. The saw should make one sample cut.

If the saw is not working properly at any time, turn it off immediately and refer to the Troubleshooting section of this User Guide.

If you do not encounter any problems, proceed to the Operation section.