Figure 1-4 Network Connection through Patch Cable

Pinout of straight patch cable

1.11FINAL INSTALL PROCESS

Once you have completed the basic wiring connections, you are ready to turn on the DVR. Simply plug in the power source. The POWER LED will light up if power is normal. Once the system has finished loading, you can begin to set up the menu options for the DVR.

14

Page 20
Image 20
EverFocus ECOR 264-8/4 F2, ECOR 264-8/4 D2 user manual Final Install Process, Network Connection through Patch Cable