CE Approved Gas Categories by Country
|
| COUNTRIES | CATEGORIES | GAS | PRESSURE (MBAR) |
|
| AUSTRIA (AT) | II2H3B/P | G20 | 20 |
|
| G30, G31 | 50 | ||
|
|
|
| ||
|
| BELGIUM (BE) | I2E(R)B | G20, G25 | 20, 25 |
|
| I3+ | G30, G31 | ||
|
|
| |||
|
| DENMARK (DK) | II2H3B/P | G20 | 20 |
|
| G30, G31 | 30 | ||
|
|
|
| ||
|
|
| II2Esi3+ | G20, G25 | 20, 25 |
|
| FRANCE (FR) | G30, G31 | ||
|
|
| |||
|
| II2Esi3P | G20, G25 | 20, 25 | |
|
|
| |||
|
|
| G31 | 50 | |
|
|
|
| ||
|
| FINLAND (FI) | II2H3B/P | G20 | 20 |
|
| G30, G31 | 30 | ||
|
|
|
| ||
|
|
| II2ELL3B/P | G20, G25 | 20 |
|
| GERMANY (DE) | G30, G31 | 50 | |
|
|
| |||
|
|
| I3P | G31 | 50 |
|
| GREECE (GR) | II2H3+ | G20 | 20 |
|
| G30, G31 | |||
|
|
|
| ||
|
| ITALY (IT) | II2H3+ | G20 | 20 |
|
| G30, G31 | |||
|
|
|
| ||
|
| IRELAND (IE) | II2H3+ | G20 | 20 |
|
| G30, G31 | |||
|
|
|
| ||
|
| LUXEMBOURG (LU) | II2E3B/P | G20 | 20 |
|
| G30, G31 | 50 | ||
|
|
|
| ||
|
|
| II2L3P | G25 | 25 |
|
| NETHERLANDS (NL) | G31 | 50 | |
|
|
| |||
|
| II2L3B/P | G25 | 25 | |
|
|
| |||
|
|
| G30, G31 | 30 | |
|
|
|
| ||
|
| NORWAY (NO) | I3B/P | G30, G31 | 30 |
|
| PORTUGAL (PT) | II2H3+ | G20 | 20 |
|
| G30, G31 | |||
|
|
|
| ||
|
|
| II2H3+ | G20 | 20 |
|
| SPAIN (ES) | G30, G31 | ||
|
|
| |||
|
| II2H3P | G20 | 20 | |
|
|
| |||
|
|
| G31 | 37, 50 | |
|
|
|
| ||
|
| SWEDEN (SE) | II2H3B/P | G20 | 20 |
|
| G30, G31 | 30 | ||
|
|
|
| ||
|
| UNITED KINGDOM (UK) | II2H3+ | G20 | 20 |
|
| G30, G31 | |||
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
CE Standard
Required airflow for the combustion air supply is 2m3/h per kW.
1.Connect the
NOTE: Some fryers are configured for a rigid connection to the gas supply line. These units are connected to the gas supply line at the rear of the unit.
When using thread compound, use very small amounts on male threads only. Use a pipe thread compound that is not affected by the chemical action of LP gases (Loctite™ PST56765 Sealant is one such compound). DO NOT apply compound to the first two threads. Doing so may allow some of the compound to enter the gas stream, resulting in clogging of burner orifices and/or the control valve.
2.Open the gas supply to the fryer and check all piping, fittings, and gas connections for leaks. A soap solution should be used for this purpose.