6. Installation Instructions

Installation Conditions

Install the drive in a location which meets the following requirements:

The ambient temperature should be be- tween -10°C and +50°C.

The humidity should be between 20 and 90% RH. Avoid any location subject to dew condensation, freezing or where the drive could come into contact with any liquids.

Mounting plate: Heat sink temperature will reach +90°C during operation. Please use thermostable material for drive mounting plate.

Multi-mounting:When 2 or more drives are installed within the drive switchboard, ar- range them side by side, keeping space (shown in the above figure) between each drive. If the drives must be lined up vertically, provide adequate ventilation so that the hot air from each drive will not affect the one above it.

Do not install in any location subject to any of the following conditions: direct sunlight, dust, corrosive gas, inflammable gas or oil mist.

The drive should be installed at an eleva- tion below 3283 feet (1000m), and vibra- tion should be less than 232 inches/s2 (5.9m/s2)

7 Wiring

Perform wiring in accordance with the fol- lowing procedure:

1)Remove the cover mounting screw at the center of the cover.

Mounting Direction and Space

3.94”

(10cm)

 

PRG

RUN

 

RESET

 

 

 

FUNC

STOP

 

DATA

 

 

 

 

FVR-C9S

0.394”

 

0.394”

(1cm)

 

(1cm)

CLOSED OPEN

3.94”

(10cm)

NOTICE: The durability and reliability of the drive will be affected by the ambient tem- perature. Do not place the unit where ambi- ent temperature is not proper.

Direction: Insert M4 size screws in the mounting screw holes in the left upper and right lower of the drive, and install the drive with these screws. Install the drive vertically. Horizontal or other positional installation will cause the drive to overheat.

Space: The drive will generate heat during operation. Allow sufficient space around the unit as shown in the above figure.

PRG

RUN

RESET

 

FUNC

STOP

DATA

 

FVR-C9S

CLOSED OPEN

Cover Mounting Screw

2)Hold the lower end of the cover, lift it up and remove the cover

2

1

Side view of inverter

3)Remove the keypad panel from the main unit, and disconnect the harness from the CN2 at the same time.

13

Page 13
Image 13
GE FVR-C9S-2UX Drive Series Installation Instructions, Wiring, Installation Conditions, Mounting Direction and Space