FVR-C9S-2UX

8. 8. 8.

Disconnect

CN 1

CN 2

CRG Lamp

5)Reinstall the cover. Connect the harness of the keypad panel to the CN2 on the main unit, then reinstall the keypad panel fitting it onto the guide pins.

 

Connect

 

 

CN 1

Guide Pin

8. 8. 8.

CN 2

CN 2

4)Arrange the main circuit and the control circuit wiring as follows.

CN 1

 

 

1

2

3

4

5

 

 

 

 

 

 

 

CN 2

 

 

 

 

Note 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

x

 

E(C) L1 L2 L3 U

V W

R

R

R

F

T

C

X

S

E W M M

 

 

 

 

 

 

 

T

Y

D

R

 

 

 

 

Note 2

6

 

 

7

 

 

 

 

}

 

}

 

Earth Power

M

3-Phase

 

 

 

 

 

 

Supply

motor

 

 

 

 

 

 

 

1

1

1

3

3

3

 

 

 

 

 

 

1

2

3

0

0

0

 

 

 

 

 

 

B

C

A

1.Motor coast-to-stop

2.Reset signal

3.Reverse-direction operation command

4.Forward-direction operation command

5.External alarm

6.Frequency setting VR

7.Combined alarm relay output

Note 1) FWD and THR are connected to CM at the factory. In this condition, starting/stopping can be performed via RUN/STOP keys on the keypad panel.

Note 2) In case of using an external potenti ometer, remove the connector by which the keypad panel and the CN2 on the drive main unit are connected.

6)As shown below, reinstall the cover onto the drive main unit, and fix it with the mount- ing screw.

1

2

Side view of inverter

14

Page 14
Image 14
GE FVR-C9S-2UX Drive Series instruction manual Disconnect CRG Lamp