Chapter 2: Installation

Step 4: Follow the same steps to attach the second bracket to the opposite side.

Step 5: After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack, as shown in Figure 7.

Figure 7: Mounting the GE-DS-82 in a rack

Step 6: Follow steps 4 and 5 of the Desktop Installation section to connect the network cabling and supply power to the Managed Switch.

SFP Transceiver Installation

This section describes how to insert an SFP transceiver into an SFP slot.

SFP transceivers are hot pluggable and hot swappable. You can insert and remove a transceiver from any SFP port without powering down the Managed Switch, as shown in Figure 8.

18

GE-DS-82 and 82-PoE Ethernet Managed Switch User Manual

Page 22
Image 22
GE 82-POE user manual SFP Transceiver Installation, Mounting the GE-DS-82 in a rack