Airport Systems
and the connection should be at the top end of the junction box. Wiring from ports in the sides of junction boxes should also be made such that the wire nuts are at the top of the junction box with the wire nut openings pointing downward, (see Figure
(f)Move down to the next intermediate (strain relief) junction box and pull enough of the wiring into the box to provide for the proper installation of the strain relief mechanism.
(g)Move down to the next intermediate junction box and repeat the above procedure until the entire tower is wired.
Manual |