during the daytime. In this case, the Master Controller will briefly try the Red Lights each night until the top beacon is repaired.

Troubleshooting Tip: To check system communications independent of most Flashhead failures, place a jumper across TB6-1 and TB6-2, set SW2-2 On, and select Local Night Mode from the switch panel. Because an Off Mode "flash" cannot fail, all the Flashheads will reply OK if they can. Be sure to restore your Master Controller to its proper configuration after testing.

3.3.4Communications Circuitry

The Master Controller transmits it flash requests, and receives replies via an RS485 serial link. The RS485 transceiver chip U2 is protected from voltage transients by surge suppression devices and by transformer/optical isolation from chassis ground and the rest of the digital board.

The microcontroller (U1) monitors its own transmissions. After each transmission, the COM OK LED will be lit green if the transmission read back properly, or turned off it there was a read-back failure. This only indicates that the transceiver chip on the Master Controller is functioning properly -- it does not indicate that the Flashheads are communicating properly.

SW3-1 (TERM) provides the necessary termination resistance for the RS485 serial network. Each end of the cable should be terminated with a resistor. Typically the Master Controller is installed at one end of the communications cable, in which case SW3-1 should be ON.

The Master Controller board also provides the ground connection for the communication cable shielding. The shield drain wire terminates at TB5-S (position 4), and a heavy trace on the circuit board connects the shield to the lower right mounting screw, and fast-on connector, both marked E1. The factory installs a grounding wire from E1 to PB1-G. This should be the only place the communications shield is grounded. You can check this by unplugging TB5, and measuring for an open circuit between the (unplugged) TB5-S screw terminal and earth ground.