The flex conduit will need to be properly mounted to the horizontal and vertical struts by way of the supplied 20-inch cable ties. These cable ties should be placed at a minimum of 3 feet apart for proper bonding to the tower structure. The distance between the cable ties may need to be reduced if the installer sees that the 3-foot distance will not allow for proper bonding and securing to the tower.

Figure 2-5, Page 2-15 depicts a standard installation layout for the Flashhead pigtails and flex conduit.

2.4.7.2Splicing Details for WC000001 Cable

The installation of the data/communication cable is the most important part of the High Intensity Lighting system installation. Without a sound connection for the data cable, the entire system will not work properly. Insure that the following steps are followed to insure a proper installation and connection.

NOTE: Splicing of the cables at any other location besides the light level is not recommended. The intermediate junction boxes between the light levels should be used as pull boxes and for strain relief only, with no splices.

The WC000001 cable is a multi-conductor cable that is used for the interconnection of the flashhead to the junction box. The WC000001 cable consists of the following wires/cable:

Figure 2-9: WC000001 Cable Overview

Item 1 (A, B, S) is the data/communication cable that is used to transmit all the data from the master controller, SGC-60, to the flashhead, SGF-60. Without a proper connection, the lighting system will flash erratically, or default to Day mode.

Items 2, 3, and 4 are used for the power input from the junction box to the flashhead.

Item 5 is the Drain Wire for the outer cable shield.

SG-60 High Intensity Strobe System

2-21

Manual EPM-00000019 Rev A

Page 36
Image 36
Honeywell SG-60 installation and operation guide Splicing Details for WC000001 Cable, WC000001 Cable Overview