Hoshizaki KM-320MAH, MWH a Freeze Cycle Diagnosis Confirm Comp and FMR continue. Confirm that

Models: KM-320MAH MRH KM-600MAH KM-650MAH MWH(-M) MRH KM-901MAH MRH/3 MWH KM-515MAH MWH

1 94
Download 94 pages 41.69 Kb
Page 20
Image 20

e)Initial Harvest Cycle Termination Diagnosis: When the thermistor reaches 48°F

(9°C), CB reads 3.9 kΩ from the thermistor and turns harvest termination over to the harvest timer (S4 dip switch 1 & 2). Check discharge line temperature. For a thermistor check, see "II.F. Thermistor Check." If 1-min. fill cycle starts after harvest timer terminates, check that FS is clean and operating properly, see "II.E. Float

Switch Check and Cleaning." If FS is closed, CB proceeds to the next cycle. If not, replace CB.

Note: The minimum total time allowed by CB for a complete harvest cycle is 2 min. Maximum harvest time allowed is 20 min.

NOTICE! On models with "G" control board and no harvest pump timer relays,

S4 dip switch 7 must remain off. Otherwise, PM energizes in reverse direction the last 50 seconds of harvest and empties water from water tank.

6)Freeze Cycle – LED 1 is on. Comp and FMR continue. PM, FM, and LLV energize. WV and HGV de‑energize. Appliance is held in freeze by a 5-min. short cycle protection timer. After 5-min. timer terminates and FS opens, freeze cycle terminates.

a)Freeze Cycle Diagnosis: Confirm Comp and FMR continue. Confirm that

PM, FM, and LLV energize. Confirm WRV opens. Next, confirm WV and HGV de‑energize. During the first 5 min. of freeze, confirm evaporator is cooling. If not, confirm WV de-energized (not leaking by), HGV de-energized (not bypassing),

LLV and FM energize, TXV and HM operate correctly, WRV opens, Comp is efficient, and refrigerant charge is correct. See "VIII.A. Specification Sheet" and "VIII.B. Performance Data."

b)Comp and FMR Diagnosis: If Comp and FMR de-energize once freeze begins, check that appliance has not shut off on HPS ("POWER OK" LED off). If so, check "3)b) HPS Diagnosis" above. If "POWER OK" LED is on, check for 115VAC at CB

K1 #1 (V) or #9 (V) to neutral (W). If 115VAC is not present and LED 1 is on, replace

CB. If 115VAC is present, check for 115VAC at CR or MC coil. If 115VAC is present, check CR or MC coil and contact continuity. Replace as needed. If CR or MC is ok, check Comp external overload, start relay, and start and run capacitors. Next, check Comp motor winding continuity. If Comp is energized but evaporator is not cooling, check for an inefficient Comp. See "VIII.B. Performance Data." If Comp is energized but FMR is not, check for 115VAC at the FMR junction box. If 115VAC is not present, check icemaker wiring connections. If 115VAC is present, check for voltage at condenser unit. If 115VAC is not present, check field wiring connections. If 115VAC is present, check FMR capacitor, motor winding, and fan blade for binding.

c)WV and HGV Diagnosis: If WV is energized, check for 115VAC at CB K1 #6 (O) to neutral (W). If 115VAC is present after PM energizes, replace CB. If 115VAC is not present, replace WV (bypassing). If HGV did not de-energize, check for 115VAC at CB K1 #2 (P) to neutral (W). If 115VAC is present after PM energizes, replace CB. If 115VAC is not present, replace HGV (bypassing).

20

Page 20
Image 20
Hoshizaki KM-320MAH, MWH KM-515MAH, MRH/3, MWH(-M) a Freeze Cycle Diagnosis Confirm Comp and FMR continue. Confirm that