Hoshizaki MWH KM-515MAH Thermostatic Bin Control Shutdown Sequence Flow Chart, Bin Full, TBC open

Models: KM-320MAH MRH KM-600MAH KM-650MAH MWH(-M) MRH KM-901MAH MRH/3 MWH KM-515MAH MWH

1 94
Download 94 pages 41.69 Kb
Page 15
Image 15
Thermostatic Bin Control Shutdown Sequence Flow Chart

"E" and "G" Control Board Without Harvest Pump Timer Operation Flow Chart, Continued

Thermostatic Bin Control Shutdown Sequence Flow Chart

Shutdown 1. Bin Full and Restart

TBC

Operation

1. Bin Full

Within 10 sec. after ice contacts TBC bulb, icemaker shuts down.

2. Icemaker Off

 

3. Ice Level Lowered

 

All components

 

No ice touching

de-energized.

 

TBC bulb.

 

 

Icemaker starts at

 

 

"1. 1-Minute Fill Cycle."

 

 

To 1. 1-Minute Fill Cycle

 

 

Ice contacts TBC bulb

TBC open

TBC closed

 

All components

 

 

de-energized

 

15

Mechanical Bin Control Shutdown Sequence Flow Chart

Shutdown 2. Icemaker Off and Restart

MBC Operation

1. Bin Full

Shutdown Delay:

Fill Cycle–15 sec. after activation.

Harvest Cycle–At the end of the harvest cycle, or up to 15 sec. into the freeze cycle if activated at the end of the harvest cycle.

Freeze Cycle–15 sec. after activation if activated at least 15 sec. before the 5-min. short cycle protection timer terminates. Otherwise, at the end of the next harvest cycle.

2. Icemaker Off

All components de-energized.

3. Ice Level Lowered

Icemaker starts at

"1. 1-Minute Fill Cycle."

To 1. 1-Minute Fill Cycle

MBC open (MBC actuator paddle engaged)

Green "BC CLOSED" LED off

Yellow "BC OPEN" LED on

Legend:

MBC–mechanical bin control

TBC–themostatic bin control

Yellow "BC OPEN" LED continues. All components de‑energized.

MBC closed

(MBC actuator paddle disengaged) Green "BC CLOSED" LED on Yellow "BC OPEN" LED off

Page 15
Image 15
Hoshizaki MWH KM-515MAH Thermostatic Bin Control Shutdown Sequence Flow Chart, Bin Full, Icemaker Off, Ice Level Lowered