Hoshizaki MWH A. Sequence of Operation Flow Chart, II. Sequence of Operation and ServiceDiagnosis

Models: KM-320MAH MRH KM-600MAH KM-650MAH MWH(-M) MRH KM-901MAH MRH/3 MWH KM-515MAH MWH

1 94
Download 94 pages 41.69 Kb
Page 14
Image 14
"E" and "G" Control Board Without Harvest Pump Timer Operation Flow Chart

"E" and "G" Control Board Without Harvest Pump Timer Operation Flow Chart

Cycle

 

 

 

1. 1-Minute

2. Harvest Cycle

 

3. Freeze Cycle

 

 

4. Pump-Out Cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Steps

 

 

 

Fill Cycle

 

• Maximum inlet water valve time: 6 min.

 

 

• Minimum freeze time: 5 min.

• Factory set for every

 

 

 

 

 

 

 

 

 

 

 

 

 

• Maximum harvest time: 20 min.

 

 

• Maximum freeze time: freeze

10th cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

timer setting

 

 

(except KM‑515M_H)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(S4 dip switch 9 & 10)

(S4 dip switch 5 & 6)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermistor in

 

 

 

 

1 to 3-min. harvest

 

 

 

5-min. minimum

 

 

• Pump motor stops for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 sec., then reverses

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FS in control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control

 

 

 

 

 

timer in control

 

 

 

freeze timer in

 

for 10/20 sec. (S4 dip

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Startup

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(S4 dip switch 1 & 2)

 

 

 

 

 

control

 

 

 

 

switch 3 & 4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FS check

 

 

 

FS closed

 

 

 

 

 

 

 

FS check

 

 

 

FS closed

 

 

 

 

FS opens or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WV energized

Comp energized

Thermistor temperature

 

 

Comp continues

 

freeze timer

Comp continues

 

 

 

 

 

reaches 48°F (9°C) (3.9 kΩ

 

 

 

terminates

FMR continues

 

 

 

 

 

 

 

 

 

 

 

FMR energized

 

 

FMR continues

 

 

 

 

 

 

 

 

 

 

 

 

or less). Harvest timer starts

 

 

 

 

HGV energized

 

 

 

 

 

 

 

 

 

FS open

HGV energized

 

 

FM energized

 

 

 

 

 

 

 

 

 

 

 

(1 to 3 min.).

 

 

 

 

WV energized (KM-320M_H S4 dip

 

 

 

 

 

 

 

 

 

WV energized

 

 

LLV energized

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switch 3 & 4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PM energized

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FS open

 

 

HGV de-energized

 

 

PM de-energizes for 2 sec.,

 

 

 

 

 

If FS is open, Comp stops and cycle returns to 1-min. fill.

 

 

WV de-energized

 

 

then reverses for 10/20 sec.

 

 

 

 

 

 

 

 

 

FM de-energized

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LLV de-energized

14

Shutdown and Restart 1. 1-Minute See next page.

1. "E" and "G" Control Board without Harvest Pump

A. Sequence of Operation Flow Chart

II. Sequence of Operation and ServiceDiagnosis

Legend:

Comp–compressor FM–fan motor FMR–fan motor-remote FS–float switch HGV–hot gas valve LLV–liquid line valve PM–pump motor WV–inlet water valve

Components Energized when the Control Switch is in the "WASH" Position

The "WASH" position on the control switch is used when cleaning and sanitizing the icemaker. When in the "WASH" position, power is supplied to the pump motor. With the cleaning valve closed, the cleaner and sanitizer flow over the outside of the evaporator plate assembly. With the cleaning valve open, the cleaner and sanitizer flow over both the outside and the inside of the evaporator plate assembly.

Note: Close the cleaning valve after cleaning and sanitizing are complete, otherwise the icemaker will not restart when the control switch is placed in the "ICE" position.

Timer Operation

Page 14
Image 14
Hoshizaki MWH A. Sequence of Operation Flow Chart, E and G Control Board Without Harvest Pump Timer Operation Flow Chart