Setting up and Installing the Interconnect Switch
NOTE: Slate blue indicates internal touch point components.
Figure
7.Insert the interconnect tray into the server blade enclosure (1).
8.Simultaneously rotate both ejector levers to the locked position (2).
Figure
9.Install the
10.Push the power supply handles to the closed position (2).
HP ProLiant BL |