installation and user information

installation process

installation process

NOTE

 

Before attempting to install your hp visualization center sv6 system,

 

 

please read the Safety Information in Chapter 1 of this document.

 

 

This installation process assumes the following steps:

 

 

Table 2-5

 

 

 

 

 

 

 

Assessment

Thoroughly review the hp visualization center sv6 Site Prep

 

 

 

Guide.

 

 

 

Register an IP address and hostname for each workstation

 

 

 

and Digi switch in the system.

 

 

 

Take future upgrades into consideration.

 

 

 

Confirm all system and display requirements with the vendor

 

 

 

of your display(s)

 

 

 

 

Preparation for

Order appropriate equipment and services

 

Wide Field

Prepare site as recommended in the hp visualization center

 

Displays

sv6 Site Prep Guide

 

 

 

 

Workstation

Locate and setup:

 

Installation

rack(s) of workstations

 

 

 

 

 

 

console monitors, keyboard, peripherals

 

 

 

cabling including power, network, etc.

 

 

 

 

Configuration

Configure workstations including passwords, networking, etc.

 

 

 

Configure and calibrate any display options

 

 

 

 

Verification

Locate and run verification test and demos

 

 

 

 

assessment

The assessment phase ensures that your computing needs are appropriately addressed. Options or future opportunities are considered at this stage so that system upgrade requirements are anticipated.

1.Review the hp visualization center sv6 Site Prep Guide to ensure that all space, power, cooling equipment handling requirements, etc. are understood. Take any future upgrades into consideration. For

36

Chapter 2