Basic operations

Preparation

Before operating the unit, make sure that all external components are correctly connected and installed.

1Open the liquid crystal panel.

Press PUSH-OPEN until the liquid crystal panel is unlocked, then open the liquid crystal panel by both hands.

CAUTION:

When not in use, close the liquid crystal panel and store it into the compartment; otherwise, it may obstruct the visibility through the rearview mirror.

Do not touch the surface of the liquid crystal panel directly.

When closing the liquid crystal panel, store it in the screen compartment until it is locked.

ENGLISH

To change the monitor position

You can select a monitor position from the four positions.

1Slide the arm lock lever to RELEASE, then pull down or push up the monitor.

2Slide the arm lock lever to HOLD, then remove the screen arm to the nearest locking position.

When closing the liquid crystal panel, push up the monitor to the highest position.

To be continued....

11

Page 11
Image 11
JVC KV-MRD900 manual Basic operations, Preparation, To change the monitor position