7
Researching the requirements
Knowing the requirements for system installation saves valuable time and
energy when the time comes for system delivery. The first step in planning
a site, then, is researching those requirements. The purpose of this section
is to define the general requirements necessary to plan and develop the site
before system installation.

General requirements

The following general requirements must be considered (in addition to local
and national building and electrical codes) when planning the installation of
an SL-1 system:
-
Equipment room environment (including preliminary floor plan and
system layout)
-
Power and grounding requirements
-
Cabling requirements (including guidelines for ordering correct cable
lengths)
-
Fire protection (including location of sprinkler heads) and safety
precautions
Installation planning 553-3001-120
<I
..:-
-...