5-14
Worksheets
Woiksheet
G
One sheet for the complete system.
Customer:
Date:
-
Fixed Amount of
Storage Required
500+2500TN
SL-1 TN
Add-On Modules
Network Groups
Trunk Circuits
Consoles
Customer Groups
Trunk Routes
Network Loops
(Excluding
Conference)
RPE Loops
Items Words Total
---
Total
Total words
(Include total from second worksheet)
(Include total words from second worksheet)
System engineering 553-3001-151