56 Preparing for delivery
In addition, here are some questions to consider when preparing for
delivery:
-
Has a request been made for equipment delivery?
-
Is a list of all equipment ordered available on site?
-
Are transportation arrangements to premises completed?
-
Is assistance available to prepare the switchroom?
From unloading area to equipment room
-
Are unloading/unpacking facilities available?
-
Are unloading/unpacking tools available? (pallet jack, for instance)
-
Is there access to and from unloading area to equipment room?
-
Is the equipment room threshold large enough for the equipment to
enter?
Note:
The equipment should be located as close to the final
installation area as possible. This will provide for an easier, perhaps
safer, installation.
Installation planning 553-3001-l 20