Preparing for delivery
The route the equipment must take from the receiving area to the
installation area must be studied in advance. The route should be measured
to ensure problem free delivery of the equipment. The following factors
must be considered:

Considerations

-
size and security of the loading and storage areas
-
capacity and availability of elevators
-
the number and size of aisles and doors en route
-
restrictions such as bends or obstructions in halls
-
floor loading capacity of the loading, storage, and equipment room
iUC!aS
-
number of steps and stairways
-
dimensions of fully-loaded, packaged system complete with shipping
pallet (39”W x 3O”D x
70%)
Note:
The SL-1 system is shipped with a software package, three
UEMs, a pedestal, and a shipping pallet (five inches high). The fourth
UEM is shipped separately. Refer to Table 9 for the weight and
dimensions of an SL-1 system.