On-Site Quick Start
CAUTION | Scheduling of the MGE Field Service Engineers typically should be |
| done 7 to 10 days before they are required |
| the UPS is critical to maintaining your schedule, please call the |
| MGE toll free telephone number at |
|
|
Final installation and
This
To insure a successful installation, each of these (4) steps should be followed in their correct sequence. Note that any unauthorized installation may cause damage to the UPS(s) and void the MGE warranty.
First steps by an on-site qualified Technical Engineer
Step 1. Unpack and position the unit
Step 2. Connect the main (utility) power
Step 3. Connect the output to the power distribution panel
Step 4. The MGE Field Service Engineer finalizes installation and the startup process.
Optional : Procedure for temporary power prior to the final startup.
Required Equipment and Tools
The following equipment and tools are recommended for
◗Digital volt meter (DVM)
◗1/8 inch slotted screwdriver
◗Pallet jack/forklift
◗Conduit installation tools
◗Nut driver set
Quick Start | QS |