Installation and User Manual

3.2.2Post Start Up Safety Check List

After initial start up of the system, normal operation of the STS should be verified. At the minimum, the following should be checked as applicable to your installation:

Remote emergency power off (REPO) operation (all switches in the STS should trip off). After this test, reset all switches in the OFF position and repeat the start up procedure.

Maintenance bypass procedure.

Proper readings on the LCD display for Voltages, Current, Frequency and Power.

Operation of the Manual Control pushbuttons (“hard keys”) on the front panel.

CAUTION

EXPOSURE TO HAZARDOUS VOLTAGES.

 

Dangerous voltage levels are still present inside the

 

STS cabinet. When bypassed/isolated, control power

 

supply circuits are still live and power is

 

provided for indicator lights and emergency power off

 

circuits. Disconnect all sources of power before

 

servicing. Refer servicing to qualified service

 

personnel.

 

 

3.2.3Shutdown Procedure

To isolate and shutdown the static switch section of the STS:

1.Check that the desired bypass source is available and that the LCD and mimic diagram display indicate that the static switch is on the desired bypass source.

2.Follow the Bypass Procedure to bypass the static switch and connect the load through the bypass switch to the desired bypass source. Isolation switches CB1, CB2, CB3A and CB3B (if installed) will be in the OFF (or Tripped) position.

86-504004-00 B03

Operation

3 —3