Installation and User Manual
1.6Single Line Diagram
During normal operation, CB1, 2, 3A and 3B (if installed) are closed and the load receives power from the designated preferred source through either SW1 or SW2 SCR switch. In the event of a preferred source failure, the STS will transfer the load to the alternate source in a fraction of a cycle. If bypassed by closing either CB4 or CB5 bypass switch, CB1, 2, 3A and 3B (if installed) are opened, isolating the static switch section for maintenance.
Figure
CB4
|
| SOURCE |
|
|
|
|
|
|
|
|
|
|
| S1 |
|
|
|
|
|
|
|
|
|
|
| INPUT | CB1 |
|
|
| SW1 |
|
|
|
|
| A | A |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| ||
SOURCE | B | B |
|
|
|
|
| CB3A | OUTPUT |
|
|
C | C |
| FUSE | TVSS 1 |
|
| A | A |
| ||
#1 |
|
|
|
| (OPTION) |
|
|
|
| ||
| N |
|
|
|
|
|
| B | B | TO | |
| G |
|
|
|
|
|
|
| C | C | |
|
|
|
| CONTROLS | CRITICAL | ||||||
|
| SOURCE |
|
|
|
| CB3B |
| N | LOAD | |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| G |
| |
|
| S2 |
|
|
|
|
|
|
|
| |
|
| INPUT | CB2 | FUSE | TVSS 2 |
| SW2 | (OPTION) |
|
|
|
| A | A |
|
|
|
| |||||
|
|
| (OPTION) |
|
|
|
|
| |||
|
|
|
|
| CB CONTROL |
|
|
| |||
| B | B |
|
|
|
|
|
|
|
| |
SOURCE |
|
|
|
|
| EPO PS |
|
|
| ||
C | C |
| CB5 |
|
|
|
|
|
| ||
#2 |
|
|
| EPO |
|
|
| ||||
| N |
|
|
|
|
|
| SHUNT TRIPS |
|
|
|
|
|
|
|
|
|
| BYPASS LEDs |
|
|
| |
| G |
|
|
|
|
|
|
|
|
|
|
|
| N |
|
|
|
|
|
|
|
|
|
|
| G |
|
|
|
|
|
|
|
|
|
|
|
| COMMUNICATIONS |
| TB1 |
|
|
|
| ||
|
| RELAY | JBUS/MODBUS | OPTION | OPTION | STS CABINET |
|
| |||
|
| CARD | CARD | CARD | CARD | 1 | 2 3 4 |
|
|
|
|
|
| (SEE SECT. 2.5.3) (SEE SECT. 2.5.4) |
|
| EPO | SOURCE LOSS TEST |
|
|
| ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
| (SEE SECTION 2.5.2.1) |
| (SEE SECTION 2.5.2.2) |
|
|
|
Introduction | 1 — 7 |