Installation and User Manual
Figure QS-4400/600A STS Input/Output Power Connections.
CONTROL WIRE PANDUIT/WIRE-WAYS
| COMMUNICATION | |
| CARDS | |
| TB1 | CONTROL WIRES |
| THREADED THROUGH |
| TERMINAL |
| UNIT |
| |
CONTROL WIRE
PANDUIT/WIRE-WAYS
BRACE AT
12" INTERVALS
CONTROL WIRES
BOTTOM ENTRY
CONDUIT PAN
Step 4 Arrival of MGE Field EngineerThe MGE Field Engineer will finalize the initial Epsilon STS™ start-up. To insure a successful installation and reliable STS service, the MGE Field Engineer will verify all of the installation connections, fusing, and then will examine the extensive set of Epsilon STS™ personalization parameters to insure that the operation of the STS exactly matches your installation requirements.
86-504004-00 B03 | Quick start | QS —5 |