Setup and Installation
2.0Scope
Setup and Installation guides the User through tools and equipment required for making hardwire connections. Included are power cable connections with wire diagrams for configuring the product to specifications, and obtaining MGE field service assistance for final installation and startup.
Final installation and
CAUTION | Scheduling of the MGE Field Service Engineers typically should be |
| done 7 to 10 days before they are required |
| the UPS is critical to maintaining your schedule, please call the |
| MGE toll free telephone number at |
|
|
To insure a successful installation, each of these (5) steps should be followed in their correct sequence. Note that any unauthorized installation may cause damage to the UPS(s) and void the MGE warranty.
First steps by an
Step 1. | Unpack and position the unit |
Step 2. | Connect the main (utility) power |
Step 3. | Connect the output to the power distribution panel |
Step 4. | The MGE Field Service Engineer finalizes installation and the startup process. |
Optional: | Procedure for temporary power prior to the final startup. |
Required Equipment and Tools
The following equipment and tools are recommended for
◗Digital volt meter (DVM)
◗1/8 inch slotted screwdriver
◗Pallet jack/forklift
◗Conduit installation tools
◗Nut driver set