E.Electrical specifications - for electrically-heated ovens

Main Blower

Control

 

 

Current

k W

 

 

 

 

Voltage

Circuit Voltage

Phase

Freq.

Draw

Rating

Poles

Wires

 

 

208-240V

120V

3 Ph

60 Hz

67.3A at 208V

26.0 kW at 208V

4 Pole

5 Wire (3 hot, 1 neut, 1 gnd)

 

(with 3 Ph blower motors)

 

 

 

58.4A at 240V

26.0 kW at 240V

 

 

 

 

 

 

 

 

 

 

 

208-240V

120V

3 Ph

60 Hz

67.3A at 208V

26.0 kW at 208V

4 Pole

5 Wire (3 hot, 1 neut, 1 gnd)

ENGLISH

(with 1 Ph blower motors)

 

 

 

58.4A at 240V

26.0 kW at 240V

 

 

 

 

 

 

 

 

 

 

200-220V (export)

120V (transfomer)

3 Ph

50/60 Hz

67.3A at 208V

24.3 kW at 208V

3 Pole

4 Wire (3 hot, 1 gnd)

 

 

 

 

 

53.5A at 220V

20.4 kW at 220V

 

 

 

 

240V (export)

120V (transformer)

3 Ph

50/60 Hz

58.4A

26.0 kW

3 Pole

4 Wire (3 hot, 1 gnd)

 

 

380V (export)

120V (transformer)

3 Ph

50/60 Hz

36.8A

24.3 kW

3 Pole

4 Wire (3 hot, 1 gnd)

 

 

400-416V (export)

120V (transfomer)

3 Ph

50/60 Hz

33.8A

24.3 kW

3 Pole

4 Wire (3 hot, 1 gnd)

 

 

480V

120V (transformer)

3 Ph

60 Hz

29.2A

26.0 kW

3 Pole

4 Wire (3 hot, 1 gnd)

 

 

 

IMPORTANT: Additional electrical information is provided on the oven's serial plate, and on the wiring diagram inside the machinery compartment.

SECTION 2 - INSTALLATION

WARNING

Keep the appliance area free and clear of combustibles.

WARNING

Do not obstruct the flow of combustion and ventilation air to and from your oven. There must be no

obstructions around or underneath the oven.

CAUTION

For additional installation information, refer to the following documents:

PS360 Pre-Installation Procedures Manual (Middleby Marshall P/N 88210-0024)

PS360 Installation Manual (Middleby Marshall P/N 88210-0025)

Or, contact your local Authorized Service Agent.

NOTE

There must be adequate clearance between the oven and combustible construction. Clearance

must also be provided for servicing and for proper operation.

NOTE

An electrical wiring diagram for the oven is located inside the machinery compartment.

NOTE

All aspects of the oven installation, including placement, utility connections, and ventilation requirements, must conform with any applicable local and national codes. These codes supercede the requirements and guide- lines provided in this manual.

NOTE

In U.S.A., the oven installation must conform with local codes, or in the absence of local codes, with the

National Fuel Gas Code, ANSI Z223.1. The oven, when installed, must be electrically grounded in accordance with local codes, or in the absence of local codes, with the National Electrical Code (NEC), or ANSI/NFPA70.

NOTE

In Canada, the oven installation must conform with local codes, or in the absence of local codes, with the Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Gas Installation Code, CAN/CGA-B149.2, as applicable. The oven, when installed, must be electrically grounded in accordance with local codes, or in the absence of local codes, with the Canadian Electrical Code CSA, C22.2, as applicable.

NOTE

For Australian installation, the oven installation must conform with AGA Code, AG601, and with any require-

ments of the appropriate statutory authority.

5

Page 5
Image 5
Middleby Marshall PS314SBI installation manual Installation