OPERATING PROCEDURE

PHOTOS

12. Removing the support heater.

Photo 11

(1)Remove the air intake grille.

(2)Remove the beam.

(3) Remove the side panel (right and left).

Screws

(4)Remove the relay connector for the pipe thermistor.

(5)Remove the under panel.

(6)Remove the drain pan.

(7)Remove the screw from the pipe cover, and remove the

pipe cover.

(8) Remove the screw from the pipe support, and remove the pipe fixed support.

Clamp

Connector

Service

panel

 

for heater

 

 

 

Electrical

 

 

box

13. Removing the heat exchanger.

Photo 12

 

 

 

(1)

Remove the air intake grille.

 

 

(2)

Remove the beam.

 

 

(3)

Remove the side panel (right and left).

 

 

(4)

Disconnect the relay connector.

 

 

(5)

Remove the under panel.

Pipe

 

(6)

Remove the drain pan.

 

support

 

(7)

Unscrew the screw of the pipe cover, and remove the

 

 

 

pipe cover.

 

 

(8)

Unscrew the screw of the pipe support, and remove the

Screws

 

 

pipe support.

 

 

(9)

Unscrew the screw of the heat exchanger, and remove

 

 

 

the heat exchanger.

 

 

 

Remove the heat exchanger with care. Since this is quite

Screw

Heat

 

 

 

heavy, removing work should be done with more than 2

Pipe cover

exchanger

 

 

 

people.

 

 

 

wWeight of heat exchanger : approx. 12 lbs.

 

 

OC277-59

Page 59
Image 59
Mitsubishi Electronics PCH42GK, PCH24GK, PCH36GK, PCH30GK OC277-59, Removing the support heater, Removing the heat exchanger