2-10 Setting Up the System
Figure 2-6. Inserting the Cage Nuts for the BSU Faceplate
5. Align the left Rack Mounting Bracket Assembly behind the mounting holes
in the vertical mounting rail (see Figure 2-7) located on the left side of the
rack cabinet. The tabs on the front and rear of the Rack Mounting Bracket
Assembly help to align it with the holes in the vertical-mounting rail.
Note: For correct mounting orientation of the Rack
Mounting Bracket Assemblies, the bottoms of the
assemblies have a wider offset than the top.
6. Install two screws (see Figure 2-7) that secure the front of the Rack
Mounting Bracket Assembly to the vertical-mounting rail and tighten
loosely.
7. Carefully align the rear holes of the Rack Mounting Bracket Assembly with
the holes in the rear vertical-mounting rail.
8. Install two screws (see Figure 2-7) that secure the rear of the R ack Mounting
Bracket Assembly to the vertical-mounting rail.
9. Tighten all four screws holding the Mounting Bracket Assembly to the
vertical mounting rails.
Note: The screws in the oblong slots of the outer rack-
mounting bracket may need to be readjusted.
10.
Tighten the six screws securing the two brackets together (see Figure 2-2).