6-12
164. Protect the server with the shock-absorbing materials, and pack it securely.
IMPORTANT: Check and adjust the system clock before operating the server again after relocating or
storing it.
If the server and the built-in optional devices are moved from a cold place to a warm place
in a short time, condensation will occur and cause malfunctions and breakdown when these
are used in such state. When you start operating these equipments again after the
transportation or the storage, make sure to wait for a sufficient period of time to use them in
the operating environment.
If the system clock goes out of alignment remarkably as time goes by, though the system
clock adjustment is performed, contact your sales agent.